Engineering and Construction
karsto 2

KEP2010 Project– EPCA execution of control systems upgrades at the Kårstø Gas Processing Plant


Sørco was awarded the option for the detail design phase of the KEP 2010 Instrument Upgrade Project. The scope of work includes detail design, construction assistance as well as follow-on engineering.

APPLY SØRCO AS • Koppholen 6 • 4313 Sandnes • TLF: 51 63 90 00