EPCA execution of control systems upgrades
Sørco Sørco was awarded the option for execution of  the detail design phase of the KEP 2010 Instrument Upgrade Project on Kårstø. The scope of work includes detail design, construction assistance as well as follow-on engineering.
 
The project includes approx. 400.000 manhrs of detail design work, ensuring that all logic from the existing control systems are preserved in the new solution. New system control diagrams (SCD ) have been developed, while close collaboration is maintained with system suppliers to interpret logic circuits in the old systems.