FEED & Design

Ula

Ula Power Upgrade


The Ula Complex comprises four electrically interconnected platforms; Living Quarters, Drilling, Production, and Wellhead. Electric power is generated on the LQ platform via three Siemens Gas Turbine generators. An “Appraise” Phase Engineering Study or...
karsto 2

KEP2010 Project – Upgrading control systems at Kårstø Gas Processing Plant


Apply Sørco was awarded the FEED/pre-engineering contract for upgrading and replacing the process control and safety systems in the Statpipe section of the Kårstø complex, as sub-contractors to M W Kellogg.
Ekofisk

Greater Ekofisk Area Development Project


In connection with ConocoPhillips’ plans for further development of the Ekofisk area, Apply Sørco was awarded a study contract to evaluate alternatives and options for reducing emissions from the Greater Ekofisk Area.
valhall flank thumb

Production optimisation on Valhall Flanks (Feasibility Study)


Problems in producing from certain wells arose on BP’s Valhall Flank South and Flank North installations as a result of high backpressure in the pipelines to Valhall Process & Compression Platform (PCP).