Production optimisation on Valhall Flanks
Problems in producing from certain wells arose on BP’s Valhall Flank South and Flank North installations as a result of high backpressure in the pipelines to Valhall Process & Compression Platform (PCP). This was causing a substantial loss of production from the Valhall flanks. Apply Sørco was commissioned to work with opportunities for
reducing the backpressure topside on the flanks through a feasibility study.
One proposal which was evaluated involved injecting drag-reducing agents (DRA) in the 7 km flowline linking the Flank South/North facilities with Vallhall PCP. In addition to the DRA option, Apply Sørco evaluated a number of other solutions – including implementation of multiphase booster pumps as well as the use of ejector technology.
APPLY SØRCO AS • Koppholen 6 • 4313 Sandnes • TLF: (+47) 51 63 90 00