Apply Home
·
For employees
FEED & Design
Modifications
M&M
Operations
BP Skarv - Preparation for Operations
Statoil - Frame Agreement SO Documentation
Talisman - Operations Support Contract
Shell - Ormen Lange, Documentation & Training Services
Statoil - Preparation and Updating of System and Operations Documentation (SO)
Apply Sørco was awarded a long term Frame Agreement with Statoil regarding preparation and updating of SO Documentation for all onshore and offshore installations – both on NCS and internationally.
SO Documentation includes the technical documentation and information which is required to operate the installation in a safe and efficient manner. The documentation comprises descriptions of the installation and all systems – i.e. design, function and control, and even more important – procedures and instructions for how the plant shall be started, operated, controlled and shut down safely.
The Frame Agreement applies for and is available for all Statoil assets and dedicated M&M contractors (Modification & Maintenance). The call-offs will be requested from the individual Statoil unit or applicable M&M Contractor of each asset.
The agreement is established to ensure consistent and updated SO documentation which is a mandatory requirement from the authorities in order to ensure that operation is executed according to current design and condition of the installation at all times.
APPLY SØRCO AS • Koppholen 6 • 4313 Sandnes • TLF: (+47) 51 63 90 00